R606.3.6.1


Section R606.3.6.1 is titled 'Bonding of backup wythe' and covers requirements for wall construction. The disallowance for masonry headers where the grout space between wythes is filled, and the requirement for metal ties to be used to connect multiple wythes together is established. The purpose of this section is to prevent structural failure.

The model shows a small section of a multiple wythe brick wall with a highlighted header row being used to tie the wythes together (which would not allow for grout to be placed between the wythes).